Roof Installation for Sydney, New South Wales

One of the steps to installing roof tiles is to prepare the ceiling for the work on the roof. Start by examining the ceiling to check out any imperfections or damages that might exist. Remove any removable trim from the roof if necessary to be able to get right under the roof tiles. If dents are visible in the ceiling and under the roof tiles, this is a good indication that your ceiling is damaged and should be repaired before installing new roof tiles or a metal roof.

Once all of your damage assessment is done, check to see that the structure and joints are sound in their structure, and then begin installing your decking required to securely install the roof for your property. All materials required to install the roof must be dry. Apply the primer to the surface of the plywood. The primer is used to penetrate and bond with all the required materials and parts of the roof. After the primer is dry, the tiles or metal sheets (colorbond roof colour chart) are installed on the roof (see also our article “Should I Repair or Replace My Roof?”).

Be sure to use felt paper on the edges as well as the walls to prevent water seepage into the walls. It is important roof installation preparation is properly done to avoid any future issues such as leaking roof and mold problems on your roof. It may cost even more to fix the problems of your roof if the job is not performed by a high quality roofing professional. If your home has a emergency roofing problems, do not hesitate to contact our roofing specialists in Sydney.

Safe Work Method

Before beginning the roof installation it is also a good idea to check all tools by unplugging them from the electrical circuit. The various items to be used are weatherproof nails, a chalk line, a nail gum eraser, a saw, a hammer, a chalk line, a spirit level, a putty knife, a trowel, a sponge, and a small grit sandpaper.

Sydney Roof Installation Service

The size of the roof to be covered with tile or metal/colorbond roof varies partly due to the cost associated with installing roof tile. Another good reason to use full size roof tiles is to allow for any future growth in the roof.

One of the most important parts of the job is the laying of the roofing tile. This is done in a staggered fashion with the long side of the first tile sitting above the round below work. All tiles are laid on this pattern before moving on to the next length of tile to be placed. The next step is to apply the adhesive which will be what holds the tiles to this article. A trowel is used to apply the adhesive.

After the tile has been mounted and the adhesive has set or dried, the next stage is to place the first tile into place. This first tile is centered once the adhesive has set or dried. The edge of the tile that sits under the previous tile must be flush with the edge of the roof to allow for later placing of the subsequent tile. After the first tile has been placed and the adhesive has set or dried, place the second tile into the space created by the first tile as well.

Continue placing the tiles one by one until you reach the top row of tiles needed for the roof. When a horizontal row has been placed, it is time to move on to the second row of tiles. This will only be laid on in the space provided by the ceiling joists of the roof. After all the tiles have been placed and the adhesive has thoroughly set or dried, it is time to lay the final rows of tile as well.

After this the roof is completed. Once the roof installation is finalised, make sure to wait until the adhesive is completely dry. Small wet spots may be present after the tile has fully dried.

Talk to the Roofing Professionals in Sydney

Whether you are looking to replace or repair your roof, talk to the roofing professionals about the various popular roof types to boost your home’s appearance. Our professional roofers in Sydney can help you maintain your roof for a long lasting roof job for your property. Click here to contact All Beaches Roofing professionals today.